1.
Anugrah R, Dona P. H A, Fatih H M, Sadrina D N. Analysis of the Implementation of the Cold Work Permit System on the DHU Unit of the Absorber Column at PT Z. Adv [Internet]. 2024Dec.25 [cited 2026Nov.15];2(12):2151-9. Available from: https://adshr.org/index.php/vo/article/view/318